Ključna putanja
Generally, but not always, the sequence of schedule activities that determines the duration of the project. Generally, it is the longest path through the project. However, a critical path can end, for example, on a schedule milestone that is in the middle of the project schedule and that has a finish-no-later-than imposed date schedule constraint. See also critical path method.
0
0
Izboljšaj
- Besedna vrsta: noun
- Sinonim(-i):
- Blossary:
- Industrija/področje: Business services
- Category: Project management
- Company: WSDOT
- Proizvod:
- Akronim/okrajšava:
Ostali jeziki:
Kaj želite sporočiti?
Terms in the News
Featured Terms
Industrija/področje: Personal care products Category: Makeup
rumenilo
Obično breskvasto ili ružičasto isticanje, koristi se za stvaranje prirodnih ružičastih obraza. Primijenjen pravilno, rumenilo može stvoriti osvježeni ...
Sodelavec
Featured blossaries
Browers Terms By Category
- Clock(712)
- Calendar(26)
Chronometry(738) Terms
- Home theatre system(386)
- Television(289)
- Amplifier(190)
- Digital camera(164)
- Digital photo frame(27)
- Radio(7)
Consumer electronics(1079) Terms
- Wireless networking(199)
- Modems(93)
- Firewall & VPN(91)
- Networking storage(39)
- Routers(3)
- Network switches(2)
Network hardware(428) Terms
- Biochemistry(4818)
- Genetic engineering(2618)
- Biomedical(4)
- Green biotechnology(4)
- Blue biotechnology(1)
Biotechnology(7445) Terms
- Film titles(41)
- Film studies(26)
- Filmmaking(17)
- Film types(13)